HOME PAGE

UP

SITE MAP

 WHAT'S NEW

 POLYURETHANE

CEMENT

 ENGINEERING

HYDROTITE

ABOUT

Mining & Tunnelling Newsletter

This newsletter provides case histories of two mine grouting projects undertaken with products and services supplied by MULTIURETHANES.


Cement Grouting
Stops 800 gpm Inflow
800 Feet Underground

United Paragon Mining Corporation, Philippines

Case history of a difficult grouting and shaft sinking project successfully undertaken with the support of engineering services from MULTIURETHANES.

Fractured Rock
Polyurethane Grouted
To Stop Leakage
Around Bulkhead at 2500 Feet Underground

Dome Mines, South Porcupine, Ontario

Case history of a polyurethane grouting project undertaken to prevent leakage through fractured rock using products, equipment and technical support services from MULTIURETHANES.

also including Technical Notes on...
Quality Control
Techniques
Products
Engineering Service


Download the mining & tunnelling newsletter
        4 page newsletter; 2 case histories; 218 KB

 NEXT PAGE

 HOME PAGE

 TOP OF PAGE

SITE MAP

 INDEX

 PHOTOS

 email

Copyright©1998-2002 MULTIURETHANES LTD. All rights reserved